Go to meeting
Fast React Systems Limited | Telephone +44 (0)1332 668942 | Contact Us | Site Map

The Best Planned Businesses Use FastReact

Online Demo

Delta Textile Improves Delivery Performance & Production Efficiency with FastReact

The Company
Delta is a leading global apparel company specialising in intimate apparel, men's underwear and socks. The company produces customised, innovative fashion and basic apparel for leading retailers and brands around the world. Since its inception in 1975, Delta has expanded to encompass design, development and manufacturing centres on four continents servicing over 50 customers in the US, the UK & continental Europe with more than 10,500 employees located worldwide.

Delta provide customers with customised vertical solutions, which encompass every stage of production, from initial design and development through manufacture of fabrics, accessories and garments to logistics, distribution and replenishment. Delta Textile Egypt is a vertically integrated underwear manufacturing business who  manufacture a varied range of different products for customers including: M&S, Calvin Klein, Tommy, Hugo Boss, Victoria Secret, Kmart, Wal*Mart, Pierre Cardin, Dim and Target.

Production is based in a mixture of own plant and various CMT subcontractors. With around 3000 employees across 4 factories, Delta Textile Egypt produce an average of around 80,000-85,000 pieces per day. They also have the ability to handle a high  volume of small order quantities (300-500 pieces per order).

The Challenges
The main business system in use at Delta is Movex, which had been enhanced through own development. However, before FastReact was installed, planning was mainly performed on spreadsheets.

These largely manual based systems caused a lack of visibility and proved very  difficult to amend when customer requirements changed. Planners were not able to see the knock on effect of any changes made, which meant that much ‘fire-fighting’ needed to take place to ensure that customer deliveries were made on time.

The Solution
The FastReact Evolution planning solution has been installed and has been fully integrated with the Movex business system to provide a centralised and effective planning environment. The installation of FastReact has removed the reliance on spreadsheet technology and has enabled the planners to focus on issue resolution as opposed to spreadsheet manipulation. A phased approach to implementation was undertaken with FastReact being initially installed in a single factory with 15 lines. The implementation proved so effective that it was quickly rolled out to the other 3 factories with another 51 lines. When asked about the implementation of FastReact, Mursi Shammas, IT Manager at Delta commented “The level of support provided has been excellent”.

The Conclusion
Since the implementation of FastReact, Delta are no longer using spreadsheets to plan. This has resulted in many business benefits being achieved including better On Time Delivery Performance (OTDP) to customers, better staff utilisation and increased production efficiency. “Production Efficiency has increased by around 10%, through the introduction of FastReact” explained Mursi Shammas.




« Back to previous page

Fast React are specialist providers of Planning, Sourcing and Critical Path Management solutions specifically developed for the Apparel, Textiles and Footwear sectors where tight margins and short lead-times are commonplace.

Latest News

Lever Style Reduce Lead Times, Improve Production Efficiency and Improve OTDP

Lever Style produce casual and fully constructed woven garments for the world's top brands including Armani, Calvin Klein, Cerruti 1881, Hugo Boss, Paul Smith, Ralph Lauren and Reiss. Production capacity is over 10 million pieces per year. FastReact has been integrated with the ERP system in place at Lever Style and has allowed them to reduce lead times, improve production efficiency and significantly reduce late shipment and air freight charges. More...

Subscribe to RSS feed | What is RSS?
Share |